FROM LEFT : Shamin, Faiz, Miss Noi, Daus, Mahfuz, Syafiq, Zaheerudin
Thursday, 26 April 2012
WEEK 14: ENGINEERS DAY
Now the time has come. After we spend 13 weeks to complete the development of our FYP project, Wind Speed Meter, today is the day where we will present our Wind Speed Meter to everyone in Unikl BMI and we will also be assessed by our assessor, Sir Mohamed Raziff bin Mohamed Noordin from Electrical Section and Madam Azliza binti Mohamad Arshad from Elecronics Section. We already prepared everything that we have learn for previous 13 weeks and InsyaAllah we hope that everything will run smoothly. During the assessing process, we have learn many valuable knowledge from our assessor regarding to our Wind Speed Meter. Every knowledge that we have learn is very useful for us to do future development to our project. I would like to express my biggest and sincerest gratitude especially to our supervisor, Miss Norrolhuda binti Sanif for being a person that always encourage us to always give the best in everything that we have done. I also want to say thank you to our friends that always give support to us during this process and to everyone in Unikl BMI, Thanks a lot.
Friday, 20 April 2012
WEEK 13 : PREPARATION FOR EXHIBITION
Assalamualaikum to all viewers. Thanks for viewing my blog. For this week, we have to prepared all stuff that we need for our booth. There are a few things that my partner and I have make for the guest during the exhibition that will be held next week. Some of it are :
WIND SPEED METER POSTER
WIND SPEED METER BROCHURE
WIND SPEED METER FLYER's
Saturday, 14 April 2012
WEEK 12 : FINAL STAGE
Finally we have completely finished and done with our project wind speed meter. Even though the same problems still occurs like last week, we are running a very tight schedule for our Final Year Project Schedule. After consulting with our supervisor, Miss Norrolhuda Binti Sanif has given us the green light to declare or project completed. But still, we need to properly explain in detail to our assessors any question that will be given to us.
WIND SPEED METER (INTERIOR LOOK)
WIND SPEED METER (EXTERIOR LOOK)
WIND SPEED METER (OPERATION)
Starting next week, I will be working on my presentation for my upcoming Final Year Project Exhibition.
Saturday, 7 April 2012
WEEK 11 : TESTING & TROUBLE SHOOT
Assalamualaikum to everyone. For this entry i will give an update about our project. Now our project is almost done. My partner Zaheerudin already finished programmed the PIC16F877A and now it's time to put the IC into the circuit and test the circuit in order to check either this project is function or not. After we run a few tries on our wind speed meter, we found that our project failed to function as required. So we try to figure out what is the problem with our project. We do the trouble shoot on our project and we found that there is a problem on our hardware. Basically the problem is came from our circuit which is the new design that we use don't have the same circuit function as the old circuit. So the problem occurred in this circuit is :
- The new circuit don't have a multiplexer
- maybe there is mistakes in programming
Actually based on the operation of this circuit from theoretical part that I already explain before, the multiplexer is very important because the multiplexer operate as a selector for which transducer will become a transducer or receiver at that time. So this new circuit don't have the multiplexer and that make this circuit cannot function.
We try to find the best solution but because the limitation of time that we have, we cannot find what is the suitable solution for this circuit.
- The new circuit don't have a multiplexer
- maybe there is mistakes in programming
Actually based on the operation of this circuit from theoretical part that I already explain before, the multiplexer is very important because the multiplexer operate as a selector for which transducer will become a transducer or receiver at that time. So this new circuit don't have the multiplexer and that make this circuit cannot function.
We try to find the best solution but because the limitation of time that we have, we cannot find what is the suitable solution for this circuit.